RENOVATION - SERAPOOL Porcelain
Renovations They should generally be installed immediately below the slide starts. If the check valves are connected too close to the pump on the pump discharge line, when the pump stops, the mass of water in the pipe will cause the check valve flap to break and the broken pieces to go into the pump impeller, inevitably damaging the pump. This is a common mechanical problem. Furthermore, some slides are not operated when there is no demand throughout the day. Another malfunction caused by these slides being operated infrequently or not at all is that disinfection chemical-enhanced water accumulating in the pump chamber causes rust formation on the pump body. When the system is operated, the rust color becomes noticeable, especially on light-colored slides. This color adheres to the slide surface, creating visual pollution and affecting sliding comfort, which is a mechanical problem that businesses complain about. How is Safety and Performance Analysis Conducted in Existing Pools? To accurately observe the safety and performance of existing pools, mechanical projects and calculation reports, as well as chemical maintenance logs or charts, must first be examined. Wet volume safety, life safety, and water quality-hygiene are very important in the construction and use of pools. Therefore, analysis must be performed in accordance with international and local standards. 111 CHANICAL&ELECTRICALSYSTEMS In particular, DIN Standards, TSE Standards, Ministry of Health, Underwater Sports and Swimming Federation guidelines, and FTO European Tour Operators Association instructions for tourism facilities (hotels, resorts, spas, and water parks) should be taken into account. Pre-Demolition Preparation and Safety Steps in Renovation Pool mechanical systems are used for many years; therefore, periodic maintenance should be performed annually. If improvements are to be made to the systems, pool calculation reports and the material selections and capacities in the reports, as well as usage positions, should be taken into account. If revision is necessary, it is Çağrı Dursun EJDER, Project Coordinator at Günsu Energy Systems INTERVIEW
powered by ikedijital.com
RkJQdWJsaXNoZXIy MTczMDA=