RENOVATION - SERAPOOL Porcelain

systems are essential. Incorrect solutions lead to mold on walls and high operating costs. Proper Material Selection Mechanical resistance, chemical resistance, and anti-slip criteria are decisive factors in coating selection. Porcelain tiles are the most preferred material in terms of aesthetics, durability, and safety. In practice, C2TE S1 class adhesives, flexible joint fillers, and epoxy joints are used to achieve a long-lasting and aesthetic result. This combination creates a long-lasting and durable coating system, especially in outdoor and wet areas, minimizing the risk of cracking and peeling. It also ensures aesthetic integrity and easy cleaning of the surface. Accessory Installations For the installation of stairs, jacuzzis, water games, and other pool accessories, AISI 316 stainless steel is used, flange gaskets are placed correctly, anchor points are reinforced with chemical dowels, and installation checks are performed before leak testing. Testing, Commissioning, and Water Chemistry Adjustment Before pool delivery, pressure testing, full water testing, mechanical leak testing, and filtration efficiency testing are performed. Water chemistry adjustments and ensuring the system is operational provide safe and healthy use. Delivery, Warranty, and Maintenance The customer is provided with technical documentation, auser andmaintenance manual, warranty documents, and test protocols. A standard 2-year warranty is provided for equipment and labor. Furthermore, criteria such as references, application quality, certification, and site discipline are meticulously followed in the selection of suppliers and subcontractors. Cost, Budget, and Sustainability Renovation costs consist of demolition/ dismantling, concrete repairs, insulation, coatingmaterials, mechanical/electrical installations, accessories, and testing/ commissioning items. Leaving a ‘surprise cost allowance’ is a critical step in budget management. For a long-lasting pool, energy-efficient inverter pumps, durable porcelain coating materials, and automation systems with low chemical consumption are recommended. Training and Technical Documentation During delivery, the customer is provided with operational training on topics such as filter cleaning, chemical dosing, winter maintenance, and fault detection. Checklists for emergency scenarios, valve directions, fuse locations, and spare part locations are communicated to the customer in detail. 92 SERAPOOL l RENOVATION

RkJQdWJsaXNoZXIy MTczMDA=