RENOVATION - SERAPOOL Porcelain

Critical PointsDuring theDismantling Process If the employer requests that the equipment in the old machine room be replaced in accordance with standards, or if the equipment in the old machine room complies with standards but is worn out and unusable, we do not encounter any problems during dismantling and perform the necessary dismantling procedures according to the relevant techniques. However, in most cases, the machine room door may be smaller than the sand filter diameter. In this case, we dismantle the sand filter and remove it, and we request that the machine room door be modified to accommodate the entry and exit of the equipment. Faulty Practices That Make Renovation Necessary The biggest problem is that the filtration system equipment is not selected in accordance with the purpose of the pool and the standards. Another significant problem is that the facility does not carry out scheduled maintenance and that maintenance work is not performed by qualified personnel. Pool maintenance must be carried out by a sufficient number of personnel with Pool Operator Certificates, depending on the size of the facility, as required by the regulations of the Ministry of Health. We always encounter these deficiencies in pools that are not built to standard. The Role of Automation in Renovation Compliance with standards is particularly important in public swimming pools. The use of automation in new and renovated pools is crucial and necessary for human health and the proper use of pool equipment. However, although public swimming pools are built by the Ministry of Youth and Sports and local governments, these institutions often overlook and fail to implement automation during the design and implementation phases due to initial investment costs. Contribution of Mechanical and Electrical Renovation to Operations The renovation of mechanical and electrical installations and the operation of pools in accordance with standards, although involving high initial investment costs, reduces energy and water consumption over time. This minimizes operating costs and creates a sustainable facility. At the same time, the service life of the equipment used in the pools is extended. Technical Criteria in System Integration Compliance with standards must be prioritized at every stage. Equipment used must have a certificate of compliance with standards, and materials and equipment without this certificate must not be used under any circumstances. In particular, cables used in electrical installations must be “marine” cables, cables between the electrical panel and the electric motor must be protected with stainless steel, and connections must be installed with precautions to prevent moisture and water ingress. 126 SERAPOOL l RENOVATION

RkJQdWJsaXNoZXIy MTczMDA=